ITHD

Custom Home Design in Toronto

A new home starts with the possibilities of its lot. Whether you are planning a knock-down and rebuild or an infill home on an existing Toronto property, ITHD brings architectural design and structural engineering together in one coordinated team. We have practised in Toronto since 2015.

This guide explains the decisions, drawings and municipal reviews to plan for. To explore the visual character of our work, visit the custom-home portfolio.

Who you will speak with

Architecture and structure, at one table.

The firm

ITHD holds a Certificate of Practice from the Ontario Association of Architects and a Certificate of Authorization from Professional Engineers Ontario.

Principal

Andrii Golovnia

Principal, P.Eng., BCIN

Scope of services

What a Toronto engagement can include

  • 01

    Site and zoning review

    Review the property information, survey and applicable zoning provisions to identify constraints and questions before developing the design.

  • 02

    Concept and schematic design

    Translate your priorities into a site strategy, room relationships, circulation and initial building form, with the lot and surrounding context in mind.

  • 03

    Design development and 3D visualisation

    Refine the layout, elevations and materials. Visualisation helps you understand the proposed spaces and exterior before the drawing package is developed further.

  • 04

    Coordinated structural engineering

    Develop the structural approach alongside the architectural design so that foundations, framing and significant openings are considered together.

  • 05

    Permit drawings and application coordination

    Prepare the agreed building permit drawing package, coordinate the application and respond to municipal review comments within the defined scope.

  • 06

    Minor variance support where needed

    If the proposal needs relief from zoning provisions, Committee of Adjustment support can be included as a separately defined scope. The applicable process depends on the property and proposal.

  • 07

    Construction-phase support

    Where included in the agreement, provide general review and shop drawing review to support the transition from drawings to construction.

Read more about our structural engineering services or planning an addition to an existing home.

The process

Six steps from first conversation to construction

  1. Step 1: Consultation and property information

    Discuss the site, existing building, priorities and proposed scope. Identify the survey and other information needed to evaluate the project.

  2. Step 2: Site strategy and zoning review

    Review the relevant zoning provisions and site conditions, and identify additional municipal, tree, conservation or grading reviews that may apply.

  3. Step 3: Concept and coordinated design

    Develop and refine the plans and exterior design, considering the structural approach and your feedback together.

  4. Step 4: Drawings and application preparation

    Prepare the coordinated permit package and identify any separately scoped minor variance or specialist submissions.

  5. Step 5: Municipal review and coordination

    Coordinate responses to review comments within the agreed scope. Approval decisions and timelines rest with the municipality and other reviewing authorities.

  6. Step 6: Construction support, where agreed

    After the relevant approvals, provide the construction-phase services set out in the proposal, such as general review and shop drawing review.

Before you draw

Toronto site considerations

Toronto zoning

The City of Toronto zoning by-law regulates matters such as building height, setbacks, lot coverage and floor area. The applicable provisions and any property-specific exceptions need review for the particular lot.

Committee of Adjustment

A proposal that does not comply with an applicable zoning provision may need a minor variance application. Whether that route is appropriate is assessed for the specific proposal; a hearing or approval is not automatic.

Protected trees

Tree protection requirements may affect the design and construction approach. City of Toronto Urban Forestry permits and an arborist's input may be needed for protected trees.

Ravines and watercourses

Properties in TRCA-regulated areas near ravines and watercourses may require conservation authority review or permits in addition to municipal approvals.

Lot grading and drainage

Plan for elevations, surface drainage and their relationship to neighbouring properties. Required grading information and supporting design depend on the site's conditions and municipal requirements.

Areas served

Toronto and the GTA

We serve Toronto, including Etobicoke, North York, Scarborough, East York and downtown/Old Toronto, and the GTA communities of Mississauga, Oakville, Vaughan, Richmond Hill, Markham, Brampton and King City.

  • Toronto
  • Etobicoke
  • North York
  • Scarborough
  • East York
  • downtown/Old Toronto
  • Mississauga
  • Oakville
  • Vaughan
  • Richmond Hill
  • Markham
  • Brampton
  • King City

Fees

A written proposal, before any work

Fees are set out in a written proposal after we understand the property and the agreed services. The proposal identifies what is included, any separately scoped work and the basis of the fee. No work begins before the proposal is approved.

Questions

What Toronto homeowners ask first

What should I bring to a Toronto infill-home consultation?
Bring an available property survey, information about the existing house, your priorities and any previous municipal correspondence. We can discuss what further site information is needed before the design and review scope is set.
Can a knock-down and rebuild use the existing footprint?
An existing footprint is not an automatic entitlement for a new house. The applicable Toronto zoning provisions, site conditions and proposed work must be reviewed before deciding what can be retained or rebuilt.
How are Toronto zoning issues considered before permit drawings?
The early site and zoning review considers matters such as height, setbacks, lot coverage and floor area. If the design needs zoning relief, we discuss the potential minor variance process and the scope of any Committee of Adjustment support before proceeding.
Do tree or ravine requirements affect a new-home design?
They can. Protected trees may require Urban Forestry permits or an arborist's input, and a property in a TRCA-regulated area may need conservation authority review. These requirements are considered with the lot strategy rather than assumed to be part of the building permit alone.
Who responds when Toronto requests changes to the drawings?
Application coordination includes responding to municipal review comments within the agreed scope. Changes to your brief, additional specialist submissions or a revised scope are discussed separately. Review decisions and timelines remain with the municipality and other authorities.
Are construction reviews and minor variance work included in the design fee?
Only the services identified in the approved written proposal are included. Committee of Adjustment support, construction general review and shop drawing review can be defined in that scope; they should not be assumed to be part of every design engagement.

Let's discuss your home.

Tell us about your property and the home you have in mind. We’ll discuss constraints, architectural and structural scope, and practical next steps. If a separately scoped feasibility review is appropriate, we can discuss that too.

Book a Custom Home Consultation

Only your name and email are required. All other fields are optional. Send your enquiry and our team will contact you to arrange a conversation.

We use the details you send only to respond to your enquiry. See our Privacy Policy.